Our
projects_

Vartry Water Supply Scheme, Monitoring, Ireland

PROJECT

Vartry Water Supply Scheme, Monitoring, Ireland

Client
> Roadbridge Limited

Sector/Market
> Infastructure, Utilities 

Services
> Monitoring –Environmental, Specialist Engineering

Location
>  Vartry, Co. Wicklow

Project summary

The Vartry Water Supply Scheme provides drinking water for a supply area stretching from Roundwood, through north Wicklow up to south Dublin and serves over 200,000 people. It was developed by Dublin Corporation in the 1860s and includes two reservoirs, a water treatment plant, a 4km tunnel under Callowhill and 40km of trunk mains that deliver water to storage reservoirs at Stillorgan in Dublin. The scheme was a significant engineering feat, with much of the ground and building works being carried out and completed by men using only picks, shovels, horses, and carts. A British Pathé archive film shows the opening of the second upper reservoir from 1923. 

At the time, the scheme greatly improved sanitation in Dublin City and helped reduce outbreaks of cholera, typhus and other diseases associated with contaminated water. The original Vartry Water Supply Scheme still provides drinking water to around 15% of the Greater Dublin Area.

Uisce Éireann invested €150 million in the Vartry Water Supply Scheme Upgrade project, to improve the scheme and ensure that water provided complies with water quality standards set out in the European Union Drinking Water Directive and the current, national Drinking Water Regulations.

In 2018, Uisce Éireann completed the new pipeline from Vartry to Callowhill. This pipeline replaced a four-kilometre-long rock lined tunnel that was at risk of collapse.

The four-kilometre-long tunnel was part of the original Vartry Water Supply Scheme and had been chiselled by hand through hard, dense “greywacke” rock. Treated water flowed through the unlined rock over its 150-year service life, gradually eroding it towards risk of collapse. A pipeline connection was required to replace the tunnel and secure the water supply to over 200,000 people in Wicklow and Dublin. This work got underway in February 2017 and was completed in December 2018 and included 4km of pipelines from Vartry to Callowhill as well as a pumping station and related infrastructure.

The new pipeline secures and safeguards the water supply for more than 200,000 people in north Wicklow and south Dublin, one of the most densely populated areas in the country.

The brief

Due to age and condition of the existing working Water supply tunnel, Murphy Geospatial was asked to supply and monitor sections of the tunnel for vibration during the construction of the new tunnel. The existing tunnel was to remain operational during construction.

Vartry Water Supply Scheme, Monitoring, Ireland

The challenges

We needed to install, commission, and maintain the monitoring system in the tunnel shafts. Equipment needed to be completely self-sufficient and be able to communicate remotely to issue alerts if triggers were breached. The area of monitoring was remote and the team was faced with harsh weather conditions.

Our work

Our highly skilled team installed the following systems at agreed locations with our client:

  • 16 seismic vibration sensors with solar system.

Figure 1 - Access shaft opening
Access shaft opening
Our Specialist Engineering Services team preparing to enter the access shaft
Our Specialist Engineering Services team preparing to enter the access shaft
Photo showing installation at top of shaft
Photo showing installation at top of shaft.
Photo showing installation at top of shaft - Image 2
Photo showing installation at top of shaft.

Our team

Installation and monitoring equipment was challenging. Equipment needed to be installed in the access shafts to the live water tunnel. Our skilled team from Specialist Engineering Services assisted by Monitoring department installed sensors as required without affecting the day-to-day running of the water supply.

The survey involves the installation and de-installation of vibration sensors inside 2 no. shafts to the water main, nos. 2 & 4. Sensors were fixed to each shaft using an adhesive bond. Each shaft is approximately 30m in depth.

Trial site, installation of 4 no. borehole sensors and 5 no. ground-mounted sensors to follow installations at shaft nos. 2 & 4.

Results

Works were completed on time and to the client’s satisfaction. Vibration due to construction works were minimal and our monitoring data enabled the client to make informed decisions that mitigated any risks or delays throughout the project.

Contact

For more information on this project, please email info@murphygs.ie or call us on +353 (0)1 690 9799