Our
projects_
PROJECT
OPW Flood Relief Schemes – Hydrographic Surveys
Client
> Local Authorities and Office of Public Works
>Natural Environment
>Flood Prevention
>Hydrographic Surveys
>Flood Modelling
Location
> Various locations, Ireland
Project details
Murphy Geospatial is part of the OPW Lot 1 Framework for Surveying Services which include:
- Survey Control,
- Topographic Surveys,
- Threshold Surveys
- Channel, Structure and Flood Defence Surveys and
- Post-flood Recording Surveys


People
Process
Framework projects are defined in Supplementary Requests for Tender (SRFT) issued by the OPW or local authorities. Building on our experience in delivering the CFRAM project and the Lot 1 projects to date, where necessary we engage with the client to clarify requirements to ensure there is no ambiguity in the project scope to ensure the desired project outcome is achieved.
Plan
Upon award of the contract, Murphy Geospatial coordinate with multiple stakeholders to ensure all necessary preparations are made. Method statements and GIS work packs are prepared for site teams. Health and Safety of our staff and the public is our top priority and each watercourse is assessed individual to determine the specific risks.
Execute
Our experienced hydrographic surveying and topographic surveying crews mobilise to undertake the works in accordance with the SRFT. Job packs are prepared to arm the field staff with all details required to ensure the data is collected in the correct location. The field teams understand the ultimate use of the field data and use their experience to capture additional data that might not have been foreseen in the effort to build the most accurate flood model possible.
Deliver
Murphy Geospatial use CAD and GIS workflows to process the field data into the required flood modelling input files. Photos and videos of each cross-section inform the flood modellers of the channel conditions and vegetation. Photos of each property surveyed as part of the threshold surveys are delivered. The workflows have been developed over 10 years and are best in class.
Review
We continue to engage with our clients post-delivery to ensure the project requirements have been met.
Techonology
We use robust surveying equipment that can withstand the harsh aquatic environments met by our field staff. GNSS technology and total station working in heavily vegetated areas ensure the data is captured to the required accuracy. Boat working is undertaken in deeper channels using sonar methods.
Contact
For more information on this project, please contact our Ireland team at info@murphygs.ie or call us on +353 (0)45 484 040